ITB-PAL-00000123905 – Khan Younis WWTP Solar PV Plant (1.3 MWp)
-
CategorySolar PV systems
-
ClientUnited Nations Development Programme (UNDP)
-
SupervisorEMCC (Engineering and Management Consulting Center)
-
Funded ByEuropean Union
-
RegionKhan Younis
-
From - To2021-04-14 - 2023-05-17
-
Value1,525,252.00$
Key facts
- Installed capacity
- 1.3 MWp (Phase 1 of a planned 7 MWp)
- Transformers
- Two 1,600 kVA 22/0.4 kV transformers; 24 kV metal-clad MV switchgear
- Modules / inverters
- 2,610 × 500 W modules; 11 × 110 kW string inverters
- Grid connection
- Synchronised with the plant's three diesel generators (1,825, 1,300 and 810 kVA)
A 1.3 MWp grid-connected solar PV plant with generator synchronisation for the Khan Younis Wastewater Treatment Plant in Al Fukhari, built as Phase 1 of a planned 7 MWp scheme to power the treatment works. Contracted by UNDP with European Union funding and supervised by EMCC; designed and built by MACC. Taken over on 17 May 2023.
Scope of work
- 2,610 monocrystalline 500 W modules on prefabricated Magnelis-coated steel structures at a fixed 15° tilt
- 11 string inverters of 110 kW with data logger
- 12,654 m² compacted kurkar base under the PV field; fence beam and 358 m of galvanised fence
- Transformer building (39 m²), administration building (68 m²) and generator building (255 m²)
- 24 kV 630 A metal-clad switchgear, two 1,600 kVA transformers and switchgear for PV and generator synchronisation
- Relocation of the plant's three diesel generators into the new building and synchronisation with the PV
- Module cleaning network (29 points), 26 lighting poles and weather station
- MV, LV and fibre-optic cabling for SCADA, CCTV and the power-plant management system
Technology and key components
- 500 W monocrystalline modules (1,305 kWp DC); 11 × 110 kW inverters
- Microgrid of PV, grid and three diesel generators (1,825, 1,300 and 810 kVA)
- Weather station with two pyranometers, ambient and module temperature and wind-speed sensors
- SCADA and power-plant management system